Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: January 25th, 2020, 2:28 am
by Proselenes
https://www.petroleumnews.com/pntruncat ... 7806.shtml

EXPLORATION & PRODUCTION 26th Jan 2020

Alaska geo survey releases annual report l EXPLORATION & PRODUCTION

Division of Geological & Geophysical Survey annual report includes 2019 fieldwork on North Slope Nanushuk, Torok, Seabee formations

Further, a large structure-from-motion survey was done of the Nanushuk and
Torok formations at Slope Mountain for use as a base for mapping reservoir-scale
sand bodies, and in modelling their seismic response (seismic forward modelling)
to better understand the seismic signature of the Brookian Nanushuk oil reservoir
sands in the subsurface at the big Willow and Pikka fields.

Masterman says indications are that 2020 will be another “impactful” year.
Among others, projects already in the planning stages include drilling four
stratigraphic core holes into....................

http://dggs.alaska.gov/webpubs/dggs/ar/text/ar2019.pdf


.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: January 27th, 2020, 1:40 pm
by Proselenes
Department of Natural Resources -

DIVISION OF OIL AND GAS

*Charlie #1 Exploration Well Lease

Erik Opstad General Manager – Alaska Operations

Accumulate Energy Alaska, Inc.

Anchorage, AK 99511

25 page Plan of Operations Charlie 1 Decision Exploration Phase including maps of Charlie 1 site

*link
https://tinyurl.com/yxycmfxr

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: January 31st, 2020, 11:13 am
by Proselenes
Spud of Charlie-1 on or before the 1st of March 2020.


https://www.petroleumnews.com/pnads/62905698.shtml


.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 1st, 2020, 1:21 pm
by Proselenes
Rig move to drilling site confirmed to commence on 15th Feb.


https://aktrucks.org/info-for-haul-rd-group-dalton-drill-rig-move/


Info for Haul Rd Group – Dalton Drill Rig Move

*** Early Notice – Permits Still in Process ***

Starting Saturday, Feb. 15, at 12 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Monday, Feb. 17, at 12 p.m.

Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays.

Road closures will be established during the move to control traffic. Over the three day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through. These are the locations and anticipated times:

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 4th, 2020, 4:18 pm
by Proselenes
Interesting read :

https://digital.akbizmag.com/issue/february-2020/changing-players-in-evolving-oil-fields/

.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 7th, 2020, 12:43 pm
by Proselenes
Things about to liven up on the 88E Yukon Gold area ?

https://www.petroleumnews.com/pnads/364251439.shtml

.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 11th, 2020, 5:22 pm
by Proselenes
Traffic events was updated yesterday (10th Feb 2020) and still showing the planned shutdown of the road for the rig move from 15th to 17th Feb).

https://511.alaska.gov/list/events/traf ... dir%5D=asc

So looks like all is still going as planned - should mean an RNS is coming Monday 17th Feb at the very latest to say Rig Move underway.

Might get an RNS this week to say Ice Road complete and rig move over the weekend.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 12th, 2020, 8:45 am
by Proselenes
Final permit to drill.........

Spud now just a couple of weeks away.

https://www.investegate.co.uk/88-energy ... 06047378C/

.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 12th, 2020, 2:02 pm
by Proselenes
Latest Cenkos update on 88E released today:


https://ufile.io/e895xbu7


.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 13th, 2020, 6:56 am
by Proselenes

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 23rd, 2020, 9:00 am
by Proselenes
Just to confirm the rig move schedule on the highway, will be complete today.


On Saturday, Feb. 22, at 4 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Sunday, Feb. 23, at 9 a.m.

Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays. Road closures will be established during the move to control traffic. Over the two day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through.

These are the locations and anticipated times:

Depart Deadhorse at 4 a.m., Saturday, Feb. 22
Pullout at mile 412.7, road open from 7 a.m. – 10:00 a.m., Saturday, Feb. 22
Pullout at mile 404.9, road open from 5 – 6:30 p.m., Saturday, Feb. 22
Pullout at mile 400.9, road open from 9:30 – 11 p.m., Saturday, Feb. 22
Open road at mile 386.7, 9 a.m., Sunday, Feb. 23

Moving the drill rig from the pullout at mile 400.9 to mile 386 will require a road closure lasting approximately 10 hours. This is the longest continuous closure. Mats will be utilized on the highway to protect infrastructure and emergency access is being coordinated with first responders. The drill rig will return to Deadhorse in mid-April, the return trip will also impact traffic. As soon as dates of the return trip are finalized they will be announced. The move schedule may be impacted by weather.

For more information, please contact Tony Lamping, Cruz Construction at tlamping@cruzconstruct.com or call 907-841-8006.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 24th, 2020, 2:22 am
by Proselenes
Very good new presentation for Feb 2020

http://clients3.weblink.com.au/pdf/88E/02205507.pdf


.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 24th, 2020, 2:26 am
by Proselenes
https://www.nextoilrush.com/88-energys- ... s-of-2020/

88 Energy’s Drill Rig is Now on its Way to Drill One of the Biggest Wells of 2020

PUBLISHED: 24-02-2020

88 Energy Ltd (AIM| ASX:88E) is now just days away from the highly anticipated spudding of the Charlie-1 well on the North Slope of Alaska.

The Nordic Calista Rig-3 has been mobilised and is now barrelling down Alaska’s Dalton Highway from.................

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 26th, 2020, 4:36 am
by Proselenes

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 26th, 2020, 8:08 am
by Proselenes

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: February 27th, 2020, 4:53 am
by Proselenes

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: March 3rd, 2020, 1:18 am
by Proselenes
Charlie-1 has spudded ( http://clients3.weblink.com.au/pdf/88E/02209960.pdf )- and now the fun starts..... Indigo formation should be entered into over the weekend or early next week.

Image

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: March 3rd, 2020, 2:19 am
by Proselenes
Updated for the recent fund raise.

Image

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: March 4th, 2020, 9:03 am
by Proselenes
4th March Cenkos note on 88E (PDF file).

https://ufile.io/lnrprlfw

.

Re: 88 Energy - Ultra High Impact Drilling Q1 2020

Posted: March 5th, 2020, 2:48 am
by Proselenes
Image