88 Energy - Ultra High Impact Drilling Q1 2020
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
https://www.petroleumnews.com/pntruncat ... 7806.shtml
EXPLORATION & PRODUCTION 26th Jan 2020
Alaska geo survey releases annual report l EXPLORATION & PRODUCTION
Division of Geological & Geophysical Survey annual report includes 2019 fieldwork on North Slope Nanushuk, Torok, Seabee formations
Further, a large structure-from-motion survey was done of the Nanushuk and
Torok formations at Slope Mountain for use as a base for mapping reservoir-scale
sand bodies, and in modelling their seismic response (seismic forward modelling)
to better understand the seismic signature of the Brookian Nanushuk oil reservoir
sands in the subsurface at the big Willow and Pikka fields.
Masterman says indications are that 2020 will be another “impactful” year.
Among others, projects already in the planning stages include drilling four
stratigraphic core holes into....................
http://dggs.alaska.gov/webpubs/dggs/ar/text/ar2019.pdf
.
EXPLORATION & PRODUCTION 26th Jan 2020
Alaska geo survey releases annual report l EXPLORATION & PRODUCTION
Division of Geological & Geophysical Survey annual report includes 2019 fieldwork on North Slope Nanushuk, Torok, Seabee formations
Further, a large structure-from-motion survey was done of the Nanushuk and
Torok formations at Slope Mountain for use as a base for mapping reservoir-scale
sand bodies, and in modelling their seismic response (seismic forward modelling)
to better understand the seismic signature of the Brookian Nanushuk oil reservoir
sands in the subsurface at the big Willow and Pikka fields.
Masterman says indications are that 2020 will be another “impactful” year.
Among others, projects already in the planning stages include drilling four
stratigraphic core holes into....................
http://dggs.alaska.gov/webpubs/dggs/ar/text/ar2019.pdf
.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Department of Natural Resources -
DIVISION OF OIL AND GAS
*Charlie #1 Exploration Well Lease
Erik Opstad General Manager – Alaska Operations
Accumulate Energy Alaska, Inc.
Anchorage, AK 99511
25 page Plan of Operations Charlie 1 Decision Exploration Phase including maps of Charlie 1 site
*link
https://tinyurl.com/yxycmfxr
DIVISION OF OIL AND GAS
*Charlie #1 Exploration Well Lease
Erik Opstad General Manager – Alaska Operations
Accumulate Energy Alaska, Inc.
Anchorage, AK 99511
25 page Plan of Operations Charlie 1 Decision Exploration Phase including maps of Charlie 1 site
*link
https://tinyurl.com/yxycmfxr
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Spud of Charlie-1 on or before the 1st of March 2020.
https://www.petroleumnews.com/pnads/62905698.shtml
.
https://www.petroleumnews.com/pnads/62905698.shtml
.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Rig move to drilling site confirmed to commence on 15th Feb.
https://aktrucks.org/info-for-haul-rd-group-dalton-drill-rig-move/
Info for Haul Rd Group – Dalton Drill Rig Move
*** Early Notice – Permits Still in Process ***
Starting Saturday, Feb. 15, at 12 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Monday, Feb. 17, at 12 p.m.
Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays.
Road closures will be established during the move to control traffic. Over the three day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through. These are the locations and anticipated times:
https://aktrucks.org/info-for-haul-rd-group-dalton-drill-rig-move/
Info for Haul Rd Group – Dalton Drill Rig Move
*** Early Notice – Permits Still in Process ***
Starting Saturday, Feb. 15, at 12 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Monday, Feb. 17, at 12 p.m.
Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays.
Road closures will be established during the move to control traffic. Over the three day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through. These are the locations and anticipated times:
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Interesting read :
https://digital.akbizmag.com/issue/february-2020/changing-players-in-evolving-oil-fields/
.
https://digital.akbizmag.com/issue/february-2020/changing-players-in-evolving-oil-fields/
.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Things about to liven up on the 88E Yukon Gold area ?
https://www.petroleumnews.com/pnads/364251439.shtml
.
https://www.petroleumnews.com/pnads/364251439.shtml
.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Traffic events was updated yesterday (10th Feb 2020) and still showing the planned shutdown of the road for the rig move from 15th to 17th Feb).
https://511.alaska.gov/list/events/traf ... dir%5D=asc
So looks like all is still going as planned - should mean an RNS is coming Monday 17th Feb at the very latest to say Rig Move underway.
Might get an RNS this week to say Ice Road complete and rig move over the weekend.
https://511.alaska.gov/list/events/traf ... dir%5D=asc
So looks like all is still going as planned - should mean an RNS is coming Monday 17th Feb at the very latest to say Rig Move underway.
Might get an RNS this week to say Ice Road complete and rig move over the weekend.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Final permit to drill.........
Spud now just a couple of weeks away.
https://www.investegate.co.uk/88-energy ... 06047378C/
.
Spud now just a couple of weeks away.
https://www.investegate.co.uk/88-energy ... 06047378C/
.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Just to confirm the rig move schedule on the highway, will be complete today.
On Saturday, Feb. 22, at 4 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Sunday, Feb. 23, at 9 a.m.
Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays. Road closures will be established during the move to control traffic. Over the two day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through.
These are the locations and anticipated times:
Depart Deadhorse at 4 a.m., Saturday, Feb. 22
Pullout at mile 412.7, road open from 7 a.m. – 10:00 a.m., Saturday, Feb. 22
Pullout at mile 404.9, road open from 5 – 6:30 p.m., Saturday, Feb. 22
Pullout at mile 400.9, road open from 9:30 – 11 p.m., Saturday, Feb. 22
Open road at mile 386.7, 9 a.m., Sunday, Feb. 23
Moving the drill rig from the pullout at mile 400.9 to mile 386 will require a road closure lasting approximately 10 hours. This is the longest continuous closure. Mats will be utilized on the highway to protect infrastructure and emergency access is being coordinated with first responders. The drill rig will return to Deadhorse in mid-April, the return trip will also impact traffic. As soon as dates of the return trip are finalized they will be announced. The move schedule may be impacted by weather.
For more information, please contact Tony Lamping, Cruz Construction at tlamping@cruzconstruct.com or call 907-841-8006.
On Saturday, Feb. 22, at 4 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Sunday, Feb. 23, at 9 a.m.
Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays. Road closures will be established during the move to control traffic. Over the two day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through.
These are the locations and anticipated times:
Depart Deadhorse at 4 a.m., Saturday, Feb. 22
Pullout at mile 412.7, road open from 7 a.m. – 10:00 a.m., Saturday, Feb. 22
Pullout at mile 404.9, road open from 5 – 6:30 p.m., Saturday, Feb. 22
Pullout at mile 400.9, road open from 9:30 – 11 p.m., Saturday, Feb. 22
Open road at mile 386.7, 9 a.m., Sunday, Feb. 23
Moving the drill rig from the pullout at mile 400.9 to mile 386 will require a road closure lasting approximately 10 hours. This is the longest continuous closure. Mats will be utilized on the highway to protect infrastructure and emergency access is being coordinated with first responders. The drill rig will return to Deadhorse in mid-April, the return trip will also impact traffic. As soon as dates of the return trip are finalized they will be announced. The move schedule may be impacted by weather.
For more information, please contact Tony Lamping, Cruz Construction at tlamping@cruzconstruct.com or call 907-841-8006.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
https://www.nextoilrush.com/88-energys- ... s-of-2020/
88 Energy’s Drill Rig is Now on its Way to Drill One of the Biggest Wells of 2020
PUBLISHED: 24-02-2020
88 Energy Ltd (AIM| ASX:88E) is now just days away from the highly anticipated spudding of the Charlie-1 well on the North Slope of Alaska.
The Nordic Calista Rig-3 has been mobilised and is now barrelling down Alaska’s Dalton Highway from.................
88 Energy’s Drill Rig is Now on its Way to Drill One of the Biggest Wells of 2020
PUBLISHED: 24-02-2020
88 Energy Ltd (AIM| ASX:88E) is now just days away from the highly anticipated spudding of the Charlie-1 well on the North Slope of Alaska.
The Nordic Calista Rig-3 has been mobilised and is now barrelling down Alaska’s Dalton Highway from.................
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Re: 88 Energy - Ultra High Impact Drilling Q1 2020
Charlie-1 has spudded ( http://clients3.weblink.com.au/pdf/88E/02209960.pdf )- and now the fun starts..... Indigo formation should be entered into over the weekend or early next week.
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
-
- Lemon Quarter
- Posts: 1372
- Joined: November 15th, 2016, 6:04 am
- Has thanked: 58 times
- Been thanked: 389 times
Return to “Oil & Gas & Energy (Sector & Companies)”
Who is online
Users browsing this forum: No registered users and 47 guests