Labour costs....
Posted: January 27th, 2018, 11:28 am
Quick query on a small rewiring job (at least it seems relatively small to me, but I am no expert...)
I have a small workshop in which I want to install a ring of 12 double sockets. The workshop has it's own consumer unit which is fine and has capacity. Access is straight forward. The cables will run in surface mounted conduit in a ring around the top of the wall dropped down for each socket. total run is around 12m.
How many days labour would you expect?
I have a small workshop in which I want to install a ring of 12 double sockets. The workshop has it's own consumer unit which is fine and has capacity. Access is straight forward. The cables will run in surface mounted conduit in a ring around the top of the wall dropped down for each socket. total run is around 12m.
How many days labour would you expect?