Donate to Remove ads

Got a credit card? use our Credit Card & Finance Calculators

Thanks to lansdown,Wasron,jfgw,Rhyd6,eyeball08, for Donating to support the site

Technical specifications - Pipework

Laughter is the best medicine, find and post jokes. nothing too saucy please, Dad jokes, Current news jokes..
Forum rules
Material posted here that is disparaging towards any group on the basis of race, faith, nationality, gender, disability or sexual orientation will be deleted and any poster of such material risks suspension.
mannannan
Lemon Pip
Posts: 94
Joined: November 5th, 2016, 10:33 am
Has thanked: 130 times
Been thanked: 122 times

Technical specifications - Pipework

#40083

Postby mannannan » March 21st, 2017, 10:54 am

1. All pipe is to be made of a long hole, surrounded by metal or plastic cent red around the hole.

2. All pipe is to be hollow throughout the entire length - do not use holes of different length than the pipe.

3. The I.D. (inside diameter) of all pipe must not exceed the O.D. (outside diameter) - otherwise the hole will be on the outside.

4. All pipe is to be supplied with nothing in the hole so that water, steam or other stuff can be put inside at a later date.

5. All pipe should be supplied without rust - this can be more readily applied at the job site. N.B. Some vendors are now able to supply pre-rusted pipe. If available in your area, this product is recommended as it will save a lot of time on the job site.

6. All pipes less than ½" diameter and less than ¾” in thickness are to be known as washers. This designation to be painted on each end.

7. All pipe over 500ft (153m) in length should have the words "long pipe" clearly painted on each end, so the Contractor will know it is a long pipe.

8. Pipe over 2 miles (3.2km) in length must have the words "long pipe" painted in the middle, so the Contractor will not have to walk the entire length of the pipe to determine whether or not it is a long pipe.

9. All pipe over 6" (152mm) in diameter must have the words "large pipe" painted on it, so the Contractor will not mistake it for small pipe.

10. Flanges must be used on all pipe. Flanges must have holes for bolts quite separate from the big hole in the middle.

11. When ordering 90 degrees, 45 degrees or 30 degrees elbow, be sure to specify right hand or left hand; otherwise you will end up going the wrong way.

12. Be sure to specify to your vendor whether you want level, uphill or downhill pipe. If you use downhill pipe for going uphill, the water will flow the wrong way.

13. All couplings should have either right hand or left hand thread, but do not mix the threads - otherwise, as the coupling is being screwed on one pipe, it is unscrewed from the other.

Return to “Laughing Lemons”

Who is online

Users browsing this forum: No registered users and 8 guests